... and a lot of Trains :)
I hope 2013 will be a good year with a lot of Model Railroading
måndag 31 december 2012
söndag 23 december 2012
fredag 21 december 2012
torsdag 13 december 2012
iPhone blogg...
Just make a trial to blog from my iPhone. The picture are taken on a meeting with the module-junta of Borås this evening
söndag 9 december 2012
Some light...
söndag 2 december 2012
Factory Weathered Micro Train cars...
... looks real nice (and got a different road no#)
A "new" and a weathered car at "Mars Textile" loading dock.
Micro Trains Factory Weathered
A "new" and a weathered car at "Mars Textile" loading dock.
Micro Trains Factory Weathered
Late evening work...
... makes results. I´ve mounted lights and a temporary wiewblock ahead of Crawford Valley.
From distance
Along the track
From distance
Along the track
lördag 1 december 2012
Testing...
...both camera and my new E5 and an old "Mike", a Kato Heavy Mikado still waiting for a decoder.
tisdag 27 november 2012
Southways...
... the building team proceeds against the south...
A wiew to the "south", from left to right, a branchline, an industrial track, siding, main and another industrial track
A wiew to the "south", from left to right, a branchline, an industrial track, siding, main and another industrial track
måndag 26 november 2012
Real nice :) ...
... a new Silver Streak arrived after a transatlantic journey by mail...
Now it´s just putting a decoder inside (when i´ve got one :( )
The strong Swedish Krona is bad for our industries but not to my hobby
Now it´s just putting a decoder inside (when i´ve got one :( )
The strong Swedish Krona is bad for our industries but not to my hobby
söndag 18 november 2012
Moving forward ...
... to the future, or just to the present ;)
The simple switchlist in "naked operations" made a jump in to my iPhone thanks to the App "Mariner Calc for iPhone"
I took my excel-spreadsheet containing all my running equipment and removed all unnecesary facts
Then I marked the cars with 1, 2, 3, ... for incoming (and 101, 102,... for outbound) and just sorted ascendeing, put in some space and put in a short description for load and destination.
Next step was transferring it to the iPhone with the built in feature.
And look :) , ready to switch.
The simple switchlist in "naked operations" made a jump in to my iPhone thanks to the App "Mariner Calc for iPhone"
I took my excel-spreadsheet containing all my running equipment and removed all unnecesary facts
Then I marked the cars with 1, 2, 3, ... for incoming (and 101, 102,... for outbound) and just sorted ascendeing, put in some space and put in a short description for load and destination.
Next step was transferring it to the iPhone with the built in feature.
And look :) , ready to switch.
onsdag 14 november 2012
Mine Run...
..., first train to Fall River Mine #1.
Ready at the staging with a GP7 and eight hoppers.
Pushed the train uphill and started switching.
Hoppers in position.
A closer wiew of the mockup...
First two hoppers loaded
Making a train with loaded
Putting empties back.
Changing direction in Crawford Valley
Ready at the staging with a GP7 and eight hoppers.
Pushed the train uphill and started switching.
Hoppers in position.
A closer wiew of the mockup...
First two hoppers loaded
Making a train with loaded
Putting empties back.
Changing direction in Crawford Valley
Down under...
..., not Australia but beneath the plywood.
A bit cramped (or who designed the layout... ;) )
Much cables in a small volume
A bit cramped (or who designed the layout... ;) )
Much cables in a small volume
tisdag 13 november 2012
Operations...
... running trains on purpose during tests.
The most basic switchlist, Car No and "target". MT=Mars Textile, FD=Fuel dealer, TT=Teamtrack...
Incoming train
Outbound 5 min later
The most basic switchlist, Car No and "target". MT=Mars Textile, FD=Fuel dealer, TT=Teamtrack...
Incoming train
Outbound 5 min later
söndag 11 november 2012
Running Trains...
First there was a lot of work done this weekend. First the track was layed on the Mine Yard, a bit more "casual" compared to the plan :)
The Junction got its switch motors mounted and wired. Directions are: lower left - Staging, lower right - Crawford Valley and upper left - the still unplanned small city above my workbench
And, at last there was a train running. Here on its way from Crawford Valley via the Junction to my americaN-staging yard
The Junction got its switch motors mounted and wired. Directions are: lower left - Staging, lower right - Crawford Valley and upper left - the still unplanned small city above my workbench
And, at last there was a train running. Here on its way from Crawford Valley via the Junction to my americaN-staging yard
lördag 3 november 2012
Sawdust...
... is frequent in the workroom.
Construction has started and reached the door. The shelf are a L-girder and then the layout are built in sections to make it possbly to make the big (or small) works on the workbench.
The switch which connect Fall River Branch to Crawford Valley.
A prewiew of where Fall River Mine will load out its coal.
Construction has started and reached the door. The shelf are a L-girder and then the layout are built in sections to make it possbly to make the big (or small) works on the workbench.
The switch which connect Fall River Branch to Crawford Valley.
A prewiew of where Fall River Mine will load out its coal.
tisdag 30 oktober 2012
Planning...
the surroundings for Crawford Valley (CV).
At home the modules will fit in to my shelf layout named Illinois Highland RR. A branch leave CV and make its way up in a small valley with a coal tipple
In the valley there are a junction thats connect the layout to movable fiddleyard in the middle of the room
At home the modules will fit in to my shelf layout named Illinois Highland RR. A branch leave CV and make its way up in a small valley with a coal tipple
In the valley there are a junction thats connect the layout to movable fiddleyard in the middle of the room
Prenumerera på:
Inlägg (Atom)