Visar inlägg med etikett Operation. Visa alla inlägg
Visar inlägg med etikett Operation. Visa alla inlägg

tisdag 1 januari 2013

söndag 9 december 2012

Some light...

... in the dark.
An animated Neon Sign from Miller Engineering on top of the brewery in the new industrial district.

Malt, hops, bottles and coal in, beer out.

söndag 18 november 2012

Moving forward ...

... to the future, or just to the present ;)

The simple switchlist in "naked operations" made a jump in to my iPhone thanks to the App "Mariner Calc for iPhone"

I took my excel-spreadsheet containing all my running equipment and removed all unnecesary facts

Then I marked the cars with 1, 2, 3, ... for incoming  (and 101, 102,... for outbound) and just sorted ascendeing, put in some space and put in a short description for load and destination.
Next step was transferring it to the iPhone with the built in feature.

And look :) , ready to switch.

onsdag 14 november 2012

Mine Run...

..., first train to Fall River Mine #1.

Ready at the staging with a GP7 and eight hoppers.

Pushed the train uphill and started switching.

Hoppers in position.

A closer wiew of the mockup...

First two hoppers loaded

Making a train with loaded

Putting empties back.

Changing direction in Crawford Valley

tisdag 13 november 2012

Operations...

... running trains on purpose during tests.

The most basic switchlist, Car No and "target". MT=Mars Textile, FD=Fuel dealer, TT=Teamtrack...

Incoming train

Outbound 5 min later