..., first train to Fall River Mine #1.
Ready at the staging with a GP7 and eight hoppers.
Pushed the train uphill and started switching.
Hoppers in position.
A closer wiew of the mockup...
First two hoppers loaded
Making a train with loaded
Putting empties back.
Changing direction in Crawford Valley
Visar inlägg med etikett Staging. Visa alla inlägg
Visar inlägg med etikett Staging. Visa alla inlägg
onsdag 14 november 2012
Mine Run...
söndag 11 november 2012
Running Trains...
First there was a lot of work done this weekend. First the track was layed on the Mine Yard, a bit more "casual" compared to the plan :)
The Junction got its switch motors mounted and wired. Directions are: lower left - Staging, lower right - Crawford Valley and upper left - the still unplanned small city above my workbench
And, at last there was a train running. Here on its way from Crawford Valley via the Junction to my americaN-staging yard
The Junction got its switch motors mounted and wired. Directions are: lower left - Staging, lower right - Crawford Valley and upper left - the still unplanned small city above my workbench
And, at last there was a train running. Here on its way from Crawford Valley via the Junction to my americaN-staging yard
Prenumerera på:
Inlägg (Atom)