... together with the landscaping I've mounted a shelf beyond the layout.
söndag 13 januari 2013
fredag 11 januari 2013
Some landscape...
... or at least som basic terraforming to the right. White Styrofoam, some filler, grinding and then light brown paint(secret recipe)
Sssch! Secret recipe= Biltema Café wallpaint with some extra brown added...
Lägg till bildtext |
tisdag 8 januari 2013
Premier run...
..., first train at south end.
Switching the lumber mill (just imagine ;) )
Boxcars at the Feed Mill.
Control Panel close up.
Switching the lumber mill (just imagine ;) )
Boxcars at the Feed Mill.
Control Panel close up.
lördag 5 januari 2013
Test Equipment...
... when mounting "recycled" Conrad Switchmotors. They got an annoying habit to malfunction and instead of being mad when they are in their right place I soldered together a small box containing a switch, three LED:s. and a socket.
Toggled :)
Toggled :)
fredag 4 januari 2013
On the workbench...
... is it a lot more easy to make connections and solder instead of working below a "static" layout.
Closer wiew of the rear side of the South End Control Panel
Closer wiew of the rear side of the South End Control Panel
tisdag 1 januari 2013
Operations...
Tracklaying...
... proceeding southways. A Feed Mill and a Lumber Yard will be located in this part together with the junction where the south branchline connects. To the right there are going to be a piece of abandoned track along the creek...
A wiew from the other direction.
A wiew from the other direction.
Etiketter:
Branchline,
Construction,
Crawford Valley,
Feed Mill,
South End
Prenumerera på:
Inlägg (Atom)