lördag 23 mars 2013

Circle closed...

...at least. After some work today I ran the first train around the room.

Extra 265 West ready at the staging(Fiddletown).

It takes left in the Y...

Passing over the new old bridge...
 

And arrive to the industrial district in "No Name (Yet) City" and the Brewery.

Other end of the small Yard.

And arrives at a well known place, Crawford Valley.

And at last arriving to the staging again through the Y

Power Off.

Be aware, the light in the tunnel...

...might be a train (but that's another story)

söndag 13 januari 2013

Shelf layout ;) ...

... together with the landscaping I've mounted a shelf beyond the layout.

fredag 11 januari 2013

Some landscape...

... or at least som basic terraforming to the right. White Styrofoam, some filler, grinding and then light brown paint(secret recipe)
Lägg till bildtext
Sssch! Secret recipe= Biltema Café wallpaint with some extra brown added...

tisdag 8 januari 2013

Premier run...

..., first train  at south end.

Switching the lumber mill (just imagine ;) )

Boxcars at the Feed Mill.

Control Panel close up.

lördag 5 januari 2013

Test Equipment...

... when mounting "recycled" Conrad Switchmotors. They got an annoying habit to malfunction and instead of being mad when they are in their right place I soldered together a small box containing a switch, three LED:s. and a socket.
Toggled :)


fredag 4 januari 2013

On the workbench...

... is it a lot more easy to make connections and solder instead of working below a "static" layout.

Closer wiew of the rear side of the South End Control Panel

tisdag 1 januari 2013